Home | About us | Sitemap | Contactus

General Profile of City/Town

Input Requirement

Data Source

Population, area, population density,

Census/statistical department

Important Activities of the Town

Master Plan, CDP, Development authorities & local bodies, Industries department etc

Road Network

State PWD, local bodies & Development authorities

go top

Existing Service Coverage

Input Requirement

Data Source

Coverage by area, by activity, population, population density etc

Municipality and subsequent analysis

go top

Landuse

Input Requirement

Data Source

Master Plan proposals

Town planning department/ Development authority

Existing development pattern

Town planning department/ Development authority/municipality.

Future development orientation

Any special activities like tourism, religious, etc

go top

Existing SW Generation Pattern

Input Requirement

Data Source

Remarks

Category wise generation

Secondary data from Municipality, if available/ primary data through survey and investigations

  • Actual weighment of samples
  • 7 days continuously from residential/commercial/institutional/others
  • Sample size corresponding to size of waste generating sources
Waste Characterization

Density, moisture, calorific value, biodegradable, non-biodegradable etc

Total quantity generation / day

Municipality/Primary analysis on the basis of secondary data

Waste from residential, commercial, institutional, industrial, road sweeping etc

As per Manual (chapter 3)
  • Residential refuse : 0.3 to 0.6 kg/cap/day
  • Commercial refuse : 0.1 to 0.2 kg/cap/day
  • Street sweepings : 0.05 to 0.2 kg/cap/day
  • Institutional refuse : 0.05 to 0.2 kg/cap/day
go top

Present System in Operation

Input Requirement

Data Source

Remarks

Type of Activities

 

E.g. street sweeping, drain cleaning, waste collection, transportation, processing and disposal etc.

Infrastructure Available

Secondary data from Municipality,

discussions with officials

 

List of manpower,equipment,vehicle with capacity/life etc

Technology used

Push cart without container, open trucks, disposal without processing, open crude dumping etc

Institutional Setup

Work distribution without any norm, week supervision by non technical/experienced persons/no separate section of SWM etc

Issues observed

In sufficient, unsuitable and incompatible equipment, work without any norm, no land for processing plant/SLF site, funds crunch, no technical expertise

Existing Infrastructure at Ghaziabad

Type

Name of Zones

Total

City

Kabir Nagar

Vijay Nagar

Mohan Nagar

Vasundara

Loader

4

2

1

1

2

10

Excavator Cum loader

2

2

1

2

2

9

Tractor trolley

13

5

5

5

1

29

Truck tipper

9

10

4

7

5

35

DP carrier 2 cum

-

2

1

-

1

4

DP container 2 cum

-

72

36

 

35

143

DP carrier 4.5 cum

6

3

1

2

3

15

DP container 4.5 cum

90

87

20

34

43

274

Tempo

6

5

7

3

3

24

RC

1

-

-

-

-

1

Tractor carrier

1

-

-

-

-

1

Present System in Operation at Ghaziabad

Ghaziabad

Present System in Operation at Ghaziabad

Ghaziabad
go top

Financial Aspect

Input Requirement

Data Source

Remarks
Budget details for SWM Operation for last 3 years

 

Municipality

 

Income and expenditure data pertaining to SWM
User charges details including rates, collection efficiency etc

 

Example:

Budget Provisions of GNN (2008-09

  • Total budget of GNN - Rs 16633 lakh
  • Total expenditure on SWM- Rs 3312 lakh (20% of total budget). Overall Rs 1667 per MT
  • Expenditure on personnel- Rs 2552 lakh (75%) or Rs 1258 per MT
  • Expenditure on transportation- Rs 830 lakh (25%) or Rs 409 per MT
go top

Involvement of Private Sector

Input Requirement

Data Source

Remarks

Areas involved

 

Municipality

 

Door to door collection / transportation / processing / any other area

Operation method

Only providing manpower/ machine / both/ only waste transportation or payment on per ton / activity basis

 

go top