Preparation of Plan
- Infrastructure requirements to meet the target year demand under different components
- Specifications for the infrastructure requirements, equipments, its life cycle period
Example : For Ghaziabad
S. No. |
Item |
Criterion/ Assumptions |
2011 |
2016 |
2021 |
2026 |
2031 |
1 |
Population (no. s) |
Master Plan & Analysis |
1,479,619 |
1,835,963 |
2,278,126 |
2,720,455 |
3,248,668 |
2 |
Sanitation worker for sweeping and drain cleaning (no. s) |
28 per 10000 population; additional 17% for leave reserve |
4,847 |
6,015 |
7,463 |
8,912 |
10,643 |
3 |
Push cart for worker (no.s) |
1 for 2 sweepers |
2,071 |
2,570 |
3,189 |
3,809 |
4,548 |
4 |
Push cart 4 containerized (no.s) |
1 for each worker; 25% more for repairs |
2,589 |
3,213 |
3,987 |
4,761 |
5,685 |
5 |
Storage bin 4.5 cum capacity - for entire population and area (no.s) |
1 for 2000 persons; add 25% more for repairs |
925 |
1,147 |
1,424 |
1,700 |
2,030 |
6 |
Carriers - for entire population and area (no.s) |
1 for 15 containers; add 25% more for repairs |
77 |
96 |
119 |
142 |
169 |
7 |
Coverage for primary collection (% population) |
Design criteria |
50% |
60% |
70% |
80% |
100% |
8 |
Population Covered (no. s) |
--do-- |
739,810 |
1,101,578 |
1,594,688 |
2,176,364 |
3,248,668 |
9 |
Waste generation (MT/d) |
--do-- |
419 |
668 |
1,037 |
1,518 |
2,431 |
10 |
Mini waste collector 1.5 cum for primary collection (no.s) |
1 for 7 MT/d add 25% for repairs |
75 |
120 |
188 |
276 |
441 |
11 |
Compactors (no.s) |
1 for 60 MT waste per day; add for 25% more for repairs |
9 |
14 |
21 |
31 |
50 |
S. No. |
Item |
Criterion/ Assumptions |
2011 |
2016 |
2021 |
2026 |
2031 |
I |
Compost Plant (for GNN Area) |
|
|
|
|
|
|
A |
Size of Plant |
|
|
|
|
|
|
1 |
Expected waste generated (MT) |
|
837 |
1,114 |
1,482 |
1,898 |
2,431 |
2 |
Biodegradable waste quantity (MT) |
56% |
469 |
624 |
830 |
1063 |
1361 |
3 |
Capacity of plant required (MT/day) |
10 years/20 years |
|
650 |
|
900 |
|
4 |
Land requirement (ha) |
|
|
6 |
|
|
|
B |
Compost Plant Equipment (for 3 sites) |
|
|
|
|
|
|
6 |
Unit & size to be provided (units, MT) |
|
|
3x200 |
|
3x300 |
|
7 |
Plant & machinery |
|
|
3 sets |
|
3 sets |
|
8 |
Loader backhoe |
|
3 |
- |
3 |
- |
3 |
9 |
Tipper 8 cum |
|
6 |
- |
6 |
- |
6 |
10 |
Tractor with tipper |
|
3 |
- |
3 |
- |
3 |
11 |
Water tanker (3000 litre capacity) |
|
3 |
- |
3 |
- |
3 |
12 |
Computerized Weigh bridge (30 MT) |
|
3 |
- |
|
|
|
13 |
Other Infrastructure works |
As per the site requirement |
|
Yes |
|
Yes |
|
B |
Sanitary Land Fill |
|
|
|
|
|
|
1 |
Expected waste generation MT/d |
As per sample survey |
837 |
1114 |
1482 |
1898 |
2431 |
2 |
Net compostable quantity (MT/day) |
56% biodegradable |
469 |
624 |
830 |
1063 |
1361 |
3 |
Residual from compost plant and non biodegradable (MT/day) |
10 % from compost plant + 16 % of total waste as inert and non-biodegradable |
181 |
241 |
320 |
410 |
525 |
4 |
Capacity of SLF required for 20 years (MT/d) |
|
335 |
|
|
|
|
5 |
Total volume of landfill required, m3 |
Assume density as 850 Kg/cum |
2,879,793 |
|
|
|
|
6 |
Total land area required for landfill include facilities, infrastructure & buffer (ha) |
|
38 |
|
|
|
|
7 |
Total land area required for compost +SLF (ha) |
|
44 |
|
|
|
|
8 |
SLF equipment (for 3 sites) |
|
|
|
|
|
|
|
Loader backhoe |
|
3 |
|
3 |
|
3 |
|
Tipper |
|
6 |
- |
6 |
- |
6 |
|
Bull dozer |
|
3 |
- |
- |
- |
- |
|
Landfill Compactor |
|
3 |
- |
- |
- |
- |
13 |
SLF infrastructure |
- |
As required |
- |
- |
- |
- |
14 |
Number of active years |
20 years or more |
- |
- |
- |
- |
- |
15 |
Closure and post closure period |
25 years |
- |
- |
- |
- |
- |
16 |
Operation and maintenance of primary collection equipment (per annum) |
10% of capital cost |
- |
- |
- |
- |
- |
17 |
Operation and maintenance of transportation equipment with transfer station (per annum) |
30% of capital cost |
- |
- |
- |
- |
- |
Infrastructure requirements to meet the target year demand under different components
Input Requirement |
Data Source |
Remarks |
Designing |
Guidelines of CPHEEO manual |
|
Equipments (collection & transportation, storage, transfer station, processing plant and at disposal site ) |
||
Design of processing plant and SLF site |
||
Others, like design of ward office etc |