Preparation of Plan


Example
: For Ghaziabad

S. No.

Item

Criterion/ Assumptions

2011

2016

2021

2026

2031

1

Population (no. s)

Master Plan & Analysis

1,479,619

1,835,963

2,278,126

2,720,455

3,248,668

2

Sanitation worker for sweeping and drain cleaning (no. s)

28 per 10000 population; additional 17% for leave reserve

4,847

6,015

7,463

8,912

10,643

3

Push cart for worker (no.s)

1 for 2 sweepers

2,071

2,570

3,189

3,809

4,548

4

Push cart 4 containerized (no.s)

1 for each worker; 25% more for repairs

2,589

3,213

3,987

4,761

5,685

5

Storage bin 4.5 cum capacity -  for entire population and area (no.s)

1 for 2000 persons; add 25% more for repairs

925

1,147

1,424

1,700

2,030

6

Carriers - for entire population and area (no.s)

1 for 15 containers; add 25% more for repairs

77

96

119

142

169

7

Coverage for primary collection (% population)

Design criteria

50%

60%

70%

80%

100%

8

Population Covered (no. s)

--do--

739,810

1,101,578

1,594,688

2,176,364

3,248,668

9

Waste generation (MT/d)

--do--

419

668

1,037

1,518

2,431

10

Mini waste collector 1.5 cum for primary collection (no.s)

1 for  7 MT/d add 25% for repairs

75

120

188

276

441

11

Compactors (no.s)

1 for 60 MT waste per day; add for 25% more for repairs

9

14

21

31

50

Infrastructure requirements to meet the target year demand under different components

S. No.

Item

Criterion/ Assumptions

2011

2016

2021

2026

2031

I

Compost Plant (for GNN Area)

 

 

 

 

 

 

A

Size of Plant

 

 

 

 

 

 

1

Expected waste generated (MT)

 

837

1,114

1,482

1,898

2,431

2

Biodegradable waste quantity  (MT)

56%

469

624

830

1063

1361

3

Capacity of plant required (MT/day)

10 years/20 years

 

650

 

900

 

4

Land requirement (ha)

 

 

6

 

 

 

B

Compost Plant Equipment (for 3 sites)

 

 

 

 

 

 

6

Unit & size to be provided (units, MT)

 

 

3x200

 

3x300

 

7

Plant & machinery

 

 

3 sets

 

3 sets

 

8

Loader backhoe

 

3

-

3

-

3

9

Tipper 8 cum

 

6

-

6

-

6

10

Tractor with tipper

 

3

-

3

-

3

11

Water tanker (3000 litre capacity)

 

3

-

3

-

3

12

Computerized Weigh bridge (30 MT)

 

3

-

 

 

 

13

Other Infrastructure works

As per the site requirement

 

Yes

 

Yes

 

B

 Sanitary Land Fill

 

 

 

 

 

 

1

Expected waste generation MT/d

As per sample survey

837

1114

1482

1898

2431

2

Net compostable quantity (MT/day)

56% biodegradable

469

624

830

1063

1361

3

Residual from compost plant and non biodegradable (MT/day)

10 % from compost plant + 16 % of total waste as inert and non-biodegradable

181

241

320

410

525

4

Capacity of SLF required for 20 years (MT/d)

 

335

 

 

 

 

5

Total volume of landfill required, m3

Assume density as 850 Kg/cum

2,879,793

 

 

 

 

6

Total land area required for landfill include facilities, infrastructure & buffer (ha)

 

38

 

 

 

 

7

 Total land area required for compost +SLF (ha)

 

44

 

 

 

 

8

SLF equipment (for 3 sites)

 

 

 

 

 

 

 

  Loader backhoe

 

3

 

3

 

3

 

  Tipper

 

6

-

6

-

6

 

  Bull dozer

 

3

-

-

-

-

 

  Landfill Compactor

 

3

-

-

-

-

13

SLF  infrastructure

-

As required

-

-

-

-

14

Number of active years

20 years or more

-

-

-

-

-

15

Closure and post closure period

25 years

-

-

-

-

-

16

Operation and maintenance of primary collection equipment (per annum)

10% of capital cost

-

-

-

-

-

17

Operation and maintenance of transportation equipment with transfer station (per annum)

30% of capital cost

-

-

-

-

-

Infrastructure requirements to meet the target year demand under different components

Input Requirement

Data Source

Remarks

 Designing

Guidelines of CPHEEO manual

Equipments (collection & transportation, storage, transfer station, processing plant and at disposal site )

Design of processing plant and SLF site

Others, like design of ward office etc

go top

Specifications for the Infrastructure requirements,

Equipments its life cycle period etc.

Input Requirement

Data Source

Remarks

Equipment

Guidelines of CPHEEO manual/manufacturers/users/experts

Transfer station

Processing plant

SLF site

any other, like ward offices etc