Profile of Town
Location
Describe location of Project city such as latitude, longitude, distance from important cities, approach by road, rail and air etc . Give a map showing location, important nearby cities and approach by road, rail, air etc
Input Requirement |
Data Source |
Remarks/Design criteria |
i)Latitude/longitude |
|
Climate
Give details of minimum, average and maximum temperature, wind direction, average yearly rainfall, rainfall period, intensity of rain fall, humidity etcInput Requirement |
Data Source |
Remarks/Design criteria |
Temperature, wind direction, average yearly rainfall and intensity, rainfall period, humidity |
Meteorological department, city master plan |
Topography
Describe topography of city. Height above MSL, contours, physical features such as River, drain, canal, water bodies, hills, valleysInput Requirement |
Data Source |
Remarks/Design criteria |
|
|
Under Ground Soil Strata & Water Table
Describe ground surface such as earth, murrum, clay, soft rock, hard rock, boulders etc. Also give under ground strata chart at different locations, water table at different locations, water table variation seasonal and over the period of time,Input Requirement |
Data Source |
Remarks/Design criteria |
|
|
Socio Economic Conditions
Describe the main occupation of the residents, brief of upcoming and existing industries mainly for commercial importance of the cityInput Requirement |
Data Source |
Remarks/Design criteria |
Survey of India urban census, NATO, district industry dept, city master plan local information |
History
Describe the history of the city for its historical importance
Input Requirement |
Data Source |
Remarks/Design criteria |
Master plan, Tourism department |
Urban Infrastructure
Describe the main occupation of the residents, brief of upcoming and existing industries mainly for commercial importance of the cityUrban Infrastructure – Water Supply
Describe existing system such as source- no of tube well, hand Pump, Open well, yield, depth of tube well, location of tube wells, pumping hours, pumping set KW, head, quality of water. If surface source then its location, discharge, drawl, Pumping set characteristics, Rising main details, Ground level and OHSR location, capacity, distribution coverage, pipe sizes, PSPs no. and location, water losses in system, bulk and consumer metering, O & M. Attach a map showing existing system. Estimate present and future requirement. Assess gaps. Describe expansion program under taken in past and those proposed for future. Head wise expenditure and revenue for last 3-5 years. Tariff and taxes. Map showing important featuresInput Requirement |
Data Source |
Remarks/Design criteria |
Source of water supply, raw water quality, No of tube wells, depth, location, yield, assembly details, strata chart, pump details, draw down, Supply per capita, distribution and rising main pipe dia, length, material, condition, details of mechanical, electrical and civil of WTP, CWPS, RWPS, details and location of reservoirs, staging, treated water quality, quality at consumer end, tariff, no of connections, PSPs, HPs, details of metering, revenue assessment, O & M expenditure, staff strength and available | take it from the Department responsible for O & M and for expansion of water supply scheme |
Waste generation depends on water supply per capita |
Urban Infrastructure – Road Network
Describe existing system: Length of different types of roads, who owns and maintains, bridges- location, under passes, rail lines. Proposed roads bridges underpasses. Map showing important features.Input Requirement |
Data Source |
Remarks/Design criteria |
Source of water supply, Length of NHW, state highway, other metalled road, WBM road, brick road, Katcha road, agencies responsible for O & M and for expansion, Program of future expansion in road network | City master plan, Local department dealing with expansion and O & M |
Length of sewer network can be taken equal to road length |
Urban Infrastructure – Drainage
Map showing all major, medium and minor drains with direction of flow. Drainage problem pockets, condition of drains, quality of drain water in dry season at different locations, discharge in drains. Which of the drains are open and which ones are closed. Works undertaken for expansion in past and proposals for expansion in future.
Input Requirement |
Data Source |
Remarks/Design criteria |
Map showing different types of drains with direction of flow and problem areas, section of drains, coverings, expenditure on expansion and cleaning in last 3-5 years, quality of waste water in drains in different seasons and at different locations, Discharge in drains at different locations, points where sewerage system is connected to drains and where drains connected to sewerage system |
Obtain from local office and update |
Flow direction in drains indicate sewer zone boundary, sewer and drain mixing points to be eliminated |
Urban Infrastructure – SWM
Describe existing systemsuch as available staff, bins, equipment, location of bins, door to door collection, segregation, collection system, transportation vehicles, trips, capacity of vehicle to handle waste. Transfer site location capacity, Places where waste is disposed-their area and location, Method of disposal, land for future SLFS, Privatization of activities, condition of bins and vehicles. Map showing important features
Input Requirement |
Data Source |
Remarks/Design criteria |
No of vehicles, equipment, their capacities, trips for transportation, bins of different types and capacities available, segregation at source, door to collection, coverage, transfer stations-no and location capacity, disposal sites, daily generation, disposal, waste characteristics, capacity of disposal sites, whether land for future LFS available if so how much |
Information from ULB |
100% SWM be targeted along with sewerage system for improved services of sewerage. Land Fill Site to be away from drains and water bodies |
Urban Infrastructure – Power
location and number of 440, 220,132 and 33 KV sub stations, Hours per day power is available in different seasons, future load estimation and expansion program for future. Map showing important features
Input Requirement |
Data Source |
Remarks/Design criteria |
Transmission system 440 kv, 132 kv and 33 kv sub station system, power consumption, power available hours per day, tariff, expansion program, responsible organization, No of connections |
Obtain from local relevant office |
Pumping hours for SPS and STP depend on power availability hours a day, Cost of power connection to SPS and STP need information about location of Sub Station, Power tariff used to find life cycle cost |
Urban Infrastructure – Sewerage/Sanitation
Describe existing sewerage system, coverage, treatment, O & M, staff available, expenditure on O & M and expansion, condition of system, effect of inadequate sewerage/sanitation on health
Input Requirement |
Data Source |
Remarks/Design criteria |
Information required is given in next chapter |
|
|